Full house addition: replacement of the existing septic system, new brick crawlspace foundation, framing, siding and roof, plus an ADA-accessible bathroom, two bedrooms, a full kitchen and a laundry room.
Finished interior walkthrough
Finished addition with new siding and roof.
Septic drain field trenches with new lines laid.
Distribution box and PVC piping for the new septic system.
New concrete septic tank delivered by crane truck.
Septic tank set into the excavation.
Brick and block foundation wall going up.
Completed brick crawlspace foundation for the addition.
Floor joists framed on the new foundation.
Wall framing tied into the existing home.
OSB sheathing on the addition walls.
House wrap and roof trusses installed.
Finished addition with covered entry, steps and porch.
Side view of the finished addition with crawlspace access.
New kitchen with white cabinets and stainless appliances.